King Fahd Hospital, Madinah

Al Madinah Al Munawarah

Complete MV and LV power infrastructure for critical-load hospital operations. Form 4 BlokSeT switchboards, MV switchgear for primary distribution, and automatic transfer schemes for clinical resilience.

Products

  • LV switchboards
  • MV switchgear
  • ATS schemes

Featured case study

When critical-load infrastructure can't fail.

Industry
Healthcare
Location
Al Madinah Al Munawarah, KSA
Scope
Complete MV and LV infrastructure
Client type
Ministry of Health

The challenge

A hospital's critical-load circuits cannot tolerate interruption, even for milliseconds: operating theaters, life support, imaging, and medical gases all depend on power that never breaks. The project called for complete MV and LV infrastructure, designed and tested to clinical reliability standards, with automatic transfer and N+1 redundancy across every critical load.

The TEPCO scope

MV switchgear for primary distribution. BlokSeT LV switchboards with Form 4 separation across the main electrical rooms. Automatic transfer scheme integration with the hospital UPS and emergency generator systems. Full life-safety load segregation. Factory acceptance testing in Madinah, site acceptance testing, and clinical commissioning.

The outcome

The hospital operates today on TEPCO infrastructure. The MV and LV systems have run for years across the facility's full operational profile: peak summer cooling load, generator transitions, and the daily load swings of a working hospital. Form 4 separation means maintenance on one section never compromises another.

Engagement

Multi-phase delivery. FAT in Madinah, SAT on site, clinical commissioning.

Evaluating TEPCO for a specific project?

Our Madinah engineering team can share the references most relevant to your industry, region, and product family, including projects subject to client confidentiality. Send us your project context and we will respond within 24 hours.