Skip to content
Industrial City (MODON), Phase 4, Al Madinah Al Munawarah, KSAInvestorsCareersinfo@tepco-ksa.com

Insights and newsroom

Technical thinking from the people who build the equipment.

Engineering articles, Saudi industry analysis, company news, and case studies. Written by TEPCO engineers and analysts, for procurement officers, consulting engineers, EPC contractors, and the policy teams driving Vision 2030.

2026
Edition
Quarterly
Publication cadence
EN · AR
Languages at launch
TEPCO engineers
Bylines

Featured article

Smart distribution, single-line

Fig. An IEC 61850 substation node radiating four feeder connections, representing distribution automation.

Vision 20308 min readDate pending

Smart grids for Vision 2030: TEPCO's roadmap to a digital, automated, and resilient Saudi grid.

Saudi Arabia has automated 32% of its distribution network as of 2024, with a target of 40% by 2025. This is what comes next, and how TEPCO's smart-ready product line is designed for it.

The transformation of Saudi Arabia's electrical grid is no longer a future ambition, it's a measurable, ongoing programme. SEC's distribution automation initiative has reshaped how the Kingdom's secondary distribution network operates: from passive infrastructure that requires manual intervention to an intelligent network where faults are isolated within seconds and service is restored without human dispatch.

For procurement teams, consulting engineers, and EPC contractors specifying equipment for SEC projects, Vision 2030 megaprojects, or industrial smart-grid programmes, the implications are concrete. Equipment specified today must be IEC 61850 compatible, not as an optional accessory, but as a baseline expectation. Substations need to communicate. RMUs need to be remotely operable. Protection schemes need to coordinate across the network.

By TEPCO KSA Engineering Team

Madinah · 2026 edition

Read the full article

Stay informed

Get TEPCO's quarterly insights briefing.

Once per quarter, we send a curated briefing on Saudi grid modernization, Vision 2030 industrial milestones, IKTVA framework updates, and TEPCO project case studies. Written for procurement, engineering, and policy teams. One email per quarter. Unsubscribe anytime.

Cadence
Quarterly
Languages
EN · AR

PDPL-compliant. Your data is never sold or shared. See our privacy policy for details.

Need an opinion on a specific technical or industry question?

Our engineering team responds to inbound technical inquiries within 24 hours. Tell us what you're working on, we'll either point you to an existing article or write a response specifically for you.