Skip to content
Industrial City (MODON), Phase 4, Al Madinah Al Munawarah, KSAInvestorsCareersinfo@tepco-ksa.com

Projects and references

The proof is in the projects.

Documented project references across Saudi Arabia and the wider MENA region: hospitals, utilities, defense facilities, industrial sites, and universities. Every reference below is a project where TEPCO equipment is running today.

10+
Saudi project references
47 years
Group project history, since 1979
6 industries
Active across the Saudi portfolio
MENA-wide
Group deployments

Featured case study

One project given the full case-study treatment, and the standard we hold on every deployment, whatever its scale or sector.

Critical-load distribution, single-line
Single-line diagram: medium-voltage intake through automatic transfer to the low-voltage busbar feeding hospital critical loads.

MV intake to clinical loads: automatic transfer, Form 4 separation, and N+1 redundancy across every critical circuit.

King Fahd Hospital, Madinah

Industry
Healthcare
Location
Al Madinah Al Munawarah, KSA
Scope
Complete MV and LV infrastructure
Client type
Ministry of Health

The challenge

A hospital's critical-load circuits cannot tolerate interruption, even for milliseconds: operating theaters, life support, imaging, and medical gases all depend on power that never breaks. The project called for complete MV and LV infrastructure, designed and tested to clinical reliability standards, with automatic transfer and N+1 redundancy across every critical load.

The TEPCO scope

MV switchgear for primary distribution. BlokSeT LV switchboards with Form 4 separation across the main electrical rooms. Automatic transfer scheme integration with the hospital UPS and emergency generator systems. Full life-safety load segregation. Factory acceptance testing in Madinah, site acceptance testing, and clinical commissioning.

The outcome

The hospital operates today on TEPCO infrastructure. The MV and LV systems have run for years across the facility's full operational profile: peak summer cooling load, generator transitions, and the daily load swings of a working hospital. Form 4 separation means maintenance on one section never compromises another.

Products specified

  • BlokSeT LV switchboards, Form 4 separation
  • MV switchgear, primary distribution
  • ATS-integrated configurations
  • Life-safety load segregation

Standards

  • IEC 61439-1, -2
  • IEC 62271-200
  • Saudi healthcare facility codes

Engagement

Multi-phase delivery. FAT in Madinah, SAT on site, clinical commissioning.

Group capability

Saudi presence. MENA-wide project depth.

TEPCO KSA's project portfolio sits within a broader group portfolio that spans 47 years and the wider MENA region. Group references include national utilities, oil and gas operators, industrial complexes, and infrastructure projects, delivered under TEPCO Group's primary brand or through specialized subsidiaries (AEI, TEI, TAI, TRE). The same engineering capability, manufacturing standards, and Schneider Electric licensing that supports our Saudi customers operates at scale across the region.

Regional depth

1979Egyptian utility approvals
TEPCO Group products are type-approved by the Egyptian Electricity Authority and deployed across Egyptian national utilities, the same product designs and quality standards manufactured in Saudi Arabia.
MENACross-region deployment
Group products are installed across multiple MENA countries through TEPCO Group's primary brand and subsidiaries. Engineering knowledge, from extreme ambient temperatures to dust environments and regional grid codes, translates directly to Saudi conditions.
1 MWpRenewable plant operational
TEPCO Group's renewable energy arm (TRE) operates a 1 MW peak rooftop solar plant delivering roughly 1,797 MWh annually to the Egyptian grid. The same renewable capability is available to Saudi customers through TEPCO KSA.

Evaluating TEPCO for a specific project?

Our Madinah engineering team can share the references most relevant to your industry, region, and product family, including projects subject to client confidentiality. Send us your project context and we will respond within 24 hours.