Projects and references
The proof is in the projects.
Documented project references across Saudi Arabia and the wider MENA region: hospitals, utilities, defense facilities, industrial sites, and universities. Every reference below is a project where TEPCO equipment is running today.
- 10+
- Saudi project references
- 47 years
- Group project history, since 1979
- 6 industries
- Active across the Saudi portfolio
- MENA-wide
- Group deployments
Featured case study
When critical-load infrastructure can't fail.
One project given the full case-study treatment, and the standard we hold on every deployment, whatever its scale or sector.
MV intake to clinical loads: automatic transfer, Form 4 separation, and N+1 redundancy across every critical circuit.
King Fahd Hospital, Madinah
- Industry
- Healthcare
- Location
- Al Madinah Al Munawarah, KSA
- Scope
- Complete MV and LV infrastructure
- Client type
- Ministry of Health
The challenge
A hospital's critical-load circuits cannot tolerate interruption, even for milliseconds: operating theaters, life support, imaging, and medical gases all depend on power that never breaks. The project called for complete MV and LV infrastructure, designed and tested to clinical reliability standards, with automatic transfer and N+1 redundancy across every critical load.
The TEPCO scope
MV switchgear for primary distribution. BlokSeT LV switchboards with Form 4 separation across the main electrical rooms. Automatic transfer scheme integration with the hospital UPS and emergency generator systems. Full life-safety load segregation. Factory acceptance testing in Madinah, site acceptance testing, and clinical commissioning.
The outcome
The hospital operates today on TEPCO infrastructure. The MV and LV systems have run for years across the facility's full operational profile: peak summer cooling load, generator transitions, and the daily load swings of a working hospital. Form 4 separation means maintenance on one section never compromises another.
Products specified
- BlokSeT LV switchboards, Form 4 separation
- MV switchgear, primary distribution
- ATS-integrated configurations
- Life-safety load segregation
Standards
- IEC 61439-1, -2
- IEC 62271-200
- Saudi healthcare facility codes
Engagement
Multi-phase delivery. FAT in Madinah, SAT on site, clinical commissioning.
Group capability
Saudi presence. MENA-wide project depth.
TEPCO KSA's project portfolio sits within a broader group portfolio that spans 47 years and the wider MENA region. Group references include national utilities, oil and gas operators, industrial complexes, and infrastructure projects, delivered under TEPCO Group's primary brand or through specialized subsidiaries (AEI, TEI, TAI, TRE). The same engineering capability, manufacturing standards, and Schneider Electric licensing that supports our Saudi customers operates at scale across the region.
Regional depth
- 1979Egyptian utility approvals
- TEPCO Group products are type-approved by the Egyptian Electricity Authority and deployed across Egyptian national utilities, the same product designs and quality standards manufactured in Saudi Arabia.
- MENACross-region deployment
- Group products are installed across multiple MENA countries through TEPCO Group's primary brand and subsidiaries. Engineering knowledge, from extreme ambient temperatures to dust environments and regional grid codes, translates directly to Saudi conditions.
- 1 MWpRenewable plant operational
- TEPCO Group's renewable energy arm (TRE) operates a 1 MW peak rooftop solar plant delivering roughly 1,797 MWh annually to the Egyptian grid. The same renewable capability is available to Saudi customers through TEPCO KSA.
Evaluating TEPCO for a specific project?
Our Madinah engineering team can share the references most relevant to your industry, region, and product family, including projects subject to client confidentiality. Send us your project context and we will respond within 24 hours.